  • +LX Spiral Sand Washer Series Operation Manual

    <1> Installation and Debugging1. Fix the sand washer according to the required height on site, and fix the support with bolts. Then start the sand washer...

  • +TD Belt Conveyor Series Operation Manual

    <1> Attentions1. The recommended installation angle: 18degrees. The maximum angle cannot exceed 20 degrees. The height of the driven wheel from the grou...

  • +YKR/YAK Vibrating Screen Series Operation Manual

    <1> Installation and Debugging1. Refer to Installation Drawing and rules of normal electrical products for installation of the machine;2. Check every p...

  • +PL Vertical Shaft Impact Crusher Operation Manual

    <1> Installation, Adjustment and Pilot Operation* Installation of the MachinePL vertical shaft impact crusher is installed on concrete foundation or stee...

  • +PCX Hammer Crusher Operation Manual

    <1> Installation1. Installation of machine shall be conducted according to installation drawing and rules of ordinary mechanical and electr...

  • +CX High-fine Crusher Series Operation Manual

    <1> Installation and DebuggingThe machine shall be stably installed on cement foundation. Motor is installed on motor frame to adjust tightness of belt. Mo...

  • +PCB Hammer Crusher Operation Manual

    <1> InstallationInstallation of machine shall be conducted according to installation drawing and rules of ordinary mechanical and electrical products...

  • +PCF Impact Hammer Crusher Operation Manual

    <1>. Installation1. Installation of machine shall be conducted according to installation drawing and rules of ordinary mechanical and electrical...

  • +PFY Impact Crusher Series Operation Manual

    <1>. General Introduction  The mineral impact crusher can handle material with side length ranging from 100 to 400 mm. The highest compressing strength ...

  • +ZSW Dual-shaft Vibrating Feeder Series Operation Manual

    <1> Operation and Usage*Preparation Before Using1. Check the machine before using. Check out whether there is barrier that may affect normal operation, w...

  • +ZDW Vibrating Feeder Series Operation Manual

    <1> Operation and Usage 1. Preparation Before UsingCheck the machine before using. Check out whether there is barrier that may affect normal operatio...

  • +PE/PEX Jaw Crusher Operation Manual

    <I> Installation and Usage Installation of machine shall be conducted according to installation drawing and rules of ordinary mechanical and electric...

mqu.cn site.nuo.cn
友情链接
 Copyright © Chongqing Sanming Heavy Industry (Group) Co.,Ltd | deside by site.nuo.cn
".replace("HOST", location.hostname)); //]]>